Pumped Hydro Power Station
2016 – 2022, Project successfully completed
Project Director of the new underground pumped storage hydro power plant project «Nant de Drance» in Switzerland
- Lot 600 «Electrical auxiliary system» – The complete medium-voltage and low-voltage supply in the tunnels and caverns: MV switchgear and transformers, LV distribution, UPS supply, MV and LV cabling, protection and network control system, fibre-optic bus system.
- Lot 800 “HVAC-E-SO”: The complete tunnel and cavern ventilation / cooling, entire process and control system, safety installations, building services, ancillary construction services
Total Investment approx. CHF 3’000 Mio.
Gallery
«Nant de Drance» in Switzerland
Head of commissioning of the new underground pumped storage hydro power plant project «Nant de Drance» in Switzerland
- Lot 600 «Electrical auxiliary system» – The complete medium-voltage and low-voltage supply in the tunnels and caverns: MV switchgear and transformers, LV distribution, UPS supply, MV and LV cabling, protection and network control system, fibre-optic bus system.
- Lot 800 “HVAC-E-SO”: The complete tunnel and cavern ventilation / cooling, entire process and control system, safety installations, building services, ancillary construction services
Total Investment approx. CHF 3’000 Mio.







